Does altering the JOB_QUEUE_PROCESSES to 0 on an Oracle DB block the Oracle jobs from being scheduled too?
I found in http://download-west.oracle.com/docs/cd/A97630_01/server.920/a96521/jobq.htm some information about it, principally, the following:
The JOB_QUEUE_PROCESSES initialization parameter controls whether a coordinator job queue process is started by an instance. If this parameter is set to 0, no coordinator job queue process is started at database startup, and consequently no job queue jobs are executed. The JOB_QUEUE_PROCESSES initialization parameter also specifies the maximum number of Jnnn processes that can concurrently run on an instance. The maximum number of processes that can be specified is 1000.
However, I am uncertain what the "coordinator job queue" represents in the grand scheme of things.