How do you get the SubSonic 3 T4 templates to rerun prior to building in VS2008? I don't have to continually "Run Custom Tool" on each one?
                +1 
                A: 
                
                
              
            Dupe: http://stackoverflow.com/questions/405560/how-to-get-t4-files-to-build-in-visual-studio
Oleg is the T4 guru, so his answer is probably as good as you'll get.
                  John Sheehan
                   2009-08-24 19:31:56