views:

13

answers:

0

Hi, Is there any way in CRS2008 / Infoview to scheduling one report to multiple file output in one schedule? i thought maybe it can, but still not found the way.

Says, I have one report say "Report by Branch.rpt", the parameter prompt is BranchCode. I want to generate the "Report by Branch.rpt" for every BranchCode in separate output generate file. Like, "Report by Branch.rpt" for BranchCode A, or "Report by Branch.rpt" for BranchCode B. So, if i run the schedule, it will generate several report based on the report parameter given.

Hope, would find the way.

Thanks in advance. Regards.