I was wondering what are the best practices regarding Scrum retrospectives results distribution.
Do you share the results with every other teams and even outside R&D or do you make the results available to the team only?
The results of our retrospectives contain suggestions on what we need to continue doing in the next iterations along with what we need to start doing and stop doing.